Uhoh, we are bad neighbours.
Jul. 16th, 2008 12:31 amThe laminate is almost done and Rob started nailing a bit of skirting board back on so we can move the furniture back. After 11:30 pm. The neighbour banged on the wall and we stopped as soon as we heard the banging - that is, I heard the banging, and Rob stopped as soon as he heard me saying "Stop! Stop, no now, I mean it, stop!"
Also, it woke Emer up, hurrah.
So now I need to go out and buy chocolates tomorrow to give the neighbour. It's a horrible thing to have done, though I think I feel it more strongly than Rob does. I don't think he's ever been on the other side of the wall, as it were.
BUT the laminate is almost ALL done and now all we need to do is replace the skirting board, move the furniture back, hoover, and put the books and DVDs and CDs back on the shelves and reconnect the two halves of the unit and re-string all the wires between the various complicated parts of the "watching prerecorded stuff or listening to music" kit.
Tomorrow I need to call the doctor and say I think I need another week's supply of antibiotics, and then see what I can do about childcare for 10 am to 12:45 pm on Monday 21st. Tomorrow should be a good day - the house is full of food because the market was today and so we went shopping. I left my glasses in Dublin so I can't cycle so Rob did that part.
The most complicated part of the laminate was the set of four boards which needed to be slotted on to the previous row when three of them had to line up with something - the angle of the bay window, the right-angle of the alcove next to the bay window, the radiator pipe. Other than that it was just the usual ends-against-unstraight-walls thing.
Also, it woke Emer up, hurrah.
So now I need to go out and buy chocolates tomorrow to give the neighbour. It's a horrible thing to have done, though I think I feel it more strongly than Rob does. I don't think he's ever been on the other side of the wall, as it were.
BUT the laminate is almost ALL done and now all we need to do is replace the skirting board, move the furniture back, hoover, and put the books and DVDs and CDs back on the shelves and reconnect the two halves of the unit and re-string all the wires between the various complicated parts of the "watching prerecorded stuff or listening to music" kit.
Tomorrow I need to call the doctor and say I think I need another week's supply of antibiotics, and then see what I can do about childcare for 10 am to 12:45 pm on Monday 21st. Tomorrow should be a good day - the house is full of food because the market was today and so we went shopping. I left my glasses in Dublin so I can't cycle so Rob did that part.
The most complicated part of the laminate was the set of four boards which needed to be slotted on to the previous row when three of them had to line up with something - the angle of the bay window, the right-angle of the alcove next to the bay window, the radiator pipe. Other than that it was just the usual ends-against-unstraight-walls thing.
(no subject)
Date: 2008-07-16 01:45 am (UTC)(no subject)
Date: 2008-07-16 07:47 am (UTC)PS it's nice to have you back!
(no subject)
Date: 2008-07-16 07:58 am (UTC)Sometimes, he needs to engage his brain ..
(no subject)
Date: 2008-07-16 10:09 am (UTC)(no subject)
Date: 2008-07-16 11:02 am (UTC)(no subject)
Date: 2008-07-16 10:55 am (UTC)